Evermotion Pass 10% Off - Get Instant Access to Thousands of 3D Assets

Check Plans

Information Clause

In accordance with the art. 13 section 1 and 2 of the European Parliament and Council Regulation 2016/679 of the 27th April, 2016 on the protection of natural persons, with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation), hereafter RODO, I hereby inform that:

1. EVERMOTION S.C., 8 Przędzalniana Str., 15-688 Białystok, Poland is the Administrator of your Personal Data (APD)

2. Data Protection Inspector can be reached through e-mail: iod@evermotion.org

3. Your personal data are to be processed on the basis of art. 6 section 1 letter a, b and f of RODO in order to:
a) prepare, conclude and execute the agreement and for other purposes approved by you,
b) to execute the legitimate interest like marketing of products and the agreement, claim assertion or defence against claims resulting from the law regulations.

4. Entities entitled to the reception of your personal data may be the authorised public bodies; mail providers; providers of the services covered by the agreement; responsible for debt recovery, keeping the archives, document utilization, legal consulting, technical services, IT services and accountancy.

5. Your personal data shall not be transferred to the third country, nor to the international bodies.

6. Your personal data shall be processed within the period of the agreement and upon your additional consent until you withdraw it. APD shall keep the data for the period of any civil law claim execution connected with the agreement.

7. You have the right to demand an access to your personal data, to correct or to delete the data if there is no other basis for the processing or any other purpose of such processing or to limit the processing of the data, to transfer the data to another administrator and to raise objections to the further data processing if there is no legal basis for further processing and to withdraw any previous consent.

8. You provide the personal data voluntarily, however they are necessary to conclude the agreement. The refusal of providing such data may result in the refusal of the agreement conclusion.

9. You have the right to lodge a complaint to the Personal Data Protection Office when in your opinion the data processing violates the regulations of General Data Protection Regulation of the 27 April, 2016 (RODO).

10. Your data will be automatically processed, including the form of profiling.
11. You are obligated to forward above mentioned information to your representative, especially if you appointed this person in the agreement as the contact person or as the representative for the agreement execution.

OK

Babylon Project

My final personal project on Lightwave before switching to 3DS Max and Vray... March twenty-sixth, two thousand three hundred and eighteen It is now more than 200 years since mankind went underground to find refuge, it is now more than 200 years since the human species reached the bowels of the earth after having exhausted its atmosphere... It is now 200 years since the "Catharsis" took place... But today marks the end of this existence... Eve, the last woman on earth has just given her last breath at the age of 61. Inexorably, deprived of the sunlight, Man was waiting for her disappearance... 100 years before Eve closed her eyes for good, the Babylon project was launched. In a madness which is well recognizable to them, this sketch had for objective to create a launching pad towards the space of cryogenic capsules. Billions of nanobots were released on the surface of the earth to create this ultimate edifice. The work lasted 36 499 days, a cloud of dust surrounded the construction site. Built at the very place where the only access under ground that the humans had is located. The monument was composed of a tower that could be seen to disappear in the clouds in a radius of more than 50 km and a temple that faced it. The latter rests on the foundations of an old Roman temple miraculously preserved underground and rebuilt by Nanobots. These microscopic machines have scoured the earth in order to succeed in their mission... Recovering wrecks, ruins and seeds... Composed of an alloy of clay and californium, the protective structure has been designed to have a maximum resis-tance while having an important electromagnetic strength. In order to cryogenize the body perfectly, it was necessary to create a high performance purification environment. This explains the creation of the temple, which, thanks to the few seeds found, was able to recreate a healthy microsystem (what a pity that it was finalized one day after Eve's death). Not being able to carry a capsule, the Nanobots had to find a "Trans-porter" controlled by their connected receivers. Through the clouds, the modi-fied 240K GT soars to the skies thanks to the electromagnetic force of the tower in order to take the last hope of humanity to its final journey. Initially, several hundred people were to take advantage of this program but only Eve left for the unknown in the hope that a superior extraterrestrial life source could revive her... Taking advantage of the space vacuum to keep its negative temperature... The capsule was originally supposed to stay in orbit around the earth thanks to the attraction force of the tower... Only, an earthquake destroyed it 3 years after Eve was put in orbit... 3 weeks after this cataclysm, the capsule was photographed by the Alph-09 satellite in orbit around Venus. It is the last document showing Eve in her sarcophagus... In loving memories of Lightwave 2022 Romain brunas https://www.behance.net/gallery/145912973/Babylon-Project

Posted on 20.06.2022

Comment
Views: 369
Comments: 0
Bulle Bulle
Other projects by Bulle

LEAVE A COMMENT

You need to be logged in to leave a comment. Don't have account? Register now.